Horizontally Laid Cladding
Option 1
Multichannel and Multibeam sections
G140150 vertical supports at the columns with Multichannel verticals within the span.
This arrangement is used where the horizontal cladding joints are only placed at the column positions and the Insulated panel spans from column to column.
The channel verticals are attached to the horizontal Multibeam rails using MTC and MB cleats and wire rope ties maybe used.
An alternative is available using Multichannels both as the horizontal rail and the vertical support for the Insulated panel.
Option 2
G140/150 vertical support member
G140150 vertical support member at all locations support of Insulated panels.
This arrangement in used where the horizontal cladding joint is placed within the span and / or on the columns and gives full flexibility for panel end joint. It allows the use of shorter Insulated panels which may assist in handling of the panels.
Where the panel end joint fall within the span the diagonal ties should be screwed rods.
An alternative is available using Multichannels both as the horizontal rail and the vertical support for the Insulated panel.
Support systems option 1 and Option 2 can be mixed on the same wall.

|